The following letter and attached table are my official comments on the Staten Island Bridges Program Modernization and Capacity Enhancement Project Draft Environmental Impact Statement and Draft Section 4(f) Statement. I oppose the expansion of the Goethals Bridge because it provides more highway capacity.
Roadway enlargements have several negative impacts, such as:
Please note, the transportation and air quality analyses in the DEIS are fraudulent. I analyzed the DEIS's 2020 estimates of peak hour traffic using the Port Authority's Staten Island bridges (see attached table). Volumes in the No Build scenario would increase only 1% under the Build alternative and decrease up to 6% under the HOV Build alternative. This is impossible. First, the volume estimates for the new facility are too low and/or the traffic projections for the No Build option are too high. Second, the DEIS's hypothesizes that traffic using the Bayonne and Outerbridge will switch to the Goethals. While some shifts are likely, the space freed on the other bridges will be filled by new trips.
I urge you to reject this project.
Sincerely,
Daniel Convissor
A .wk1 spreadsheet of this table is available
Change in Bridges' Peak Hour Vehicle Volumes | |||||||
Note: "Totals" represent the change in total capacity and volume on all Port Authority Staten Island bridges.
(vph) = Vehicles Per Hour. Vol/Cap = Volume/Capacity | |||||||
Morning Peak Hour | |||||||
Build Alternative in 2020 from No Build Alternative in 2020 | |||||||
Westbound (Northbound) | Eastbound (Southbound) | ||||||
---|---|---|---|---|---|---|---|
Capacity (vph) | Peak Hour (vph) | Vol/Cap | Capacity (vph) | Peak Hour (vph) | Vol/Cap | ||
Goethals | 75% | 32% | -24% | 50% | 3% | -32% | |
Outerbridge | 0% | -12% | -12% | 0% | -0% | -0% | |
Bayonne | 0% | -21% | -21% | 0% | -0% | -0% | |
Total | 24% | 1% | -19% | 16% | 1% | -13% | |
HOV Build Alternative in 2020 from No Build Alternative in 2020 | |||||||
Westbound (Northbound) | Eastbound (Southbound) | ||||||
Capacity (vph) | Peak Hour (vph) | Vol/Cap | Capacity (vph) | Peak Hour (vph) | Vol/Cap | ||
Goethals | 57% | 31% | -16% | 71% | -2% | -42% | |
Outerbridge | 0% | -14% | -14% | 0% | -4% | -4% | |
Bayonne | 0% | -27% | -27% | 0% | 24% | 24% | |
Total | 18% | -2% | -17% | 23% | -0% | -19% | |
Evening Peak Hour | |||||||
Build Alternative in 2020 from No Build Alternative in 2020 | |||||||
Westbound (Northbound) | Eastbound (Southbound) | ||||||
Capacity (vph) | Peak Hour (vph) | Vol/Cap | Capacity (vph) | Peak Hour (vph) | Vol/Cap | ||
Goethals | 60% | 1% | -37% | 69% | 17% | -30% | |
Outerbridge | 0% | -0% | -0% | 0% | -5% | -5% | |
Bayonne | 0% | 1% | 1% | 0% | -15% | -15% | |
Total | 19% | 1% | -15% | 23% | 1% | -18% | |
HOV Build Alternative in 2020 from No Build Alternative in 2020 | |||||||
Westbound (Northbound) | Eastbound (Southbound) | ||||||
Capacity (vph) | Peak Hour (vph) | Vol/Cap | Capacity (vph) | Peak Hour (vph) | Vol/Cap | ||
Goethals | 57% | -6% | -40% | 53% | 16% | -24% | |
Outerbridge | 0% | -5% | -5% | 0% | -5% | -5% | |
Bayonne | 0% | -4% | -4% | 0% | -15% | -15% | |
Total | 18% | -6% | -20% | 18% | 0% | -15% |
These calculations are based on volumes in Tables 6B-23 and 6B-24.
Staten Island Bridges Program Modernization and Capacity Enhancement Project
Draft Environmental Impact Statement and Draft Section 4(f) Statement.
Coast Guard, US Department of Transportation. May, 1995.
This page is hosted by Daniel Convissor
Home Page: http://www.panix.com/~danielc/
This URL: http://www.panix.com/~danielc/region/goetdeis.htm
Last updated: 4 April 1999