They are STILL Having Fastener Problems?

Boeing has delayed the first flight of the 787, again.

Not a surprise, considering the strike, but it appears that the work stoppage is only part of it:

Included in the assessment is a costly manufacturing error. Boeing acknowledges a need to reinstall slightly less than 3% of all fasteners throughout its production system.

I’m beginning to think that they should hire a Witch Doctor, and slaughter a pig to get the demons out.

Leave a Reply